Educational Projects

building and reconstruction of a number of schools in addition to rehabilitating institutes and educational and technical colleges for the student at diploma level in the area of scientific rehabilitation and technical training.

Health Projects

building, reconstructing and rehabilitating 7 hospitals and OPDs.

Water Projects

establishing water purification plants, water treatment and laying down water supply system to supply pure water for the needy areas.

Roads and Bridges Projects:

working on two bridges destroyed by floods in Khyber Pakhtoon Khwa. In addition to that, a study is going on to construct a road of 50 km. in South Waziristan.

Project Sector No. of Projects Total Cost (US $)
Educational Projects 51 26,063,450
Water Projects 64 5,773,145
Health Projects 07 17,163,000
Roads and Bidge Projects 03 61,000,405
Total Projects 125 110,000,000
News & Events
All News

music/Background.mp3