building and reconstruction of a number of schools in addition to rehabilitating institutes and educational and technical colleges for the student at diploma level in the area of scientific rehabilitation and technical training.
Health Projectsbuilding, reconstructing and rehabilitating 7 hospitals and OPDs.
Water Projectsestablishing water purification plants, water treatment and laying down water supply system to supply pure water for the needy areas.
Roads and Bridges Projects:working on two bridges destroyed by floods in Khyber Pakhtoon Khwa. In addition to that, a study is going on to construct a road of 50 km. in South Waziristan.
| Project Sector | No. of Projects | Total Cost (US $) |
|---|---|---|
| Educational Projects | 51 | 26,063,450 |
| Water Projects | 64 | 5,773,145 |
| Health Projects | 07 | 17,163,000 |
| Roads and Bidge Projects | 03 | 61,000,405 |
| Total Projects | 125 | 110,000,000 |